BusinessNationalTravel

KAI and INKA Invest Rp14.88 Trillion, Here Are the New Trains and Routes They Serve

JAKARTA – PT Kereta Api Indonesia (Persero), or KAI Group, and state-owned train manufacturer PT Industri Kereta Api (Persero), or INKA, are investing up to Rp14.88 trillion in the procurement and modernization of Indonesia’s railway assets. The investment covers intercity trains, Commuter Line services, the Jabodebek LRT, luxury trains, and freight wagons.

The program is part of efforts to increase passenger and logistics capacity while strengthening the domestic railway industry.

KAI Vice President of Corporate Communications Anne Purba said the partnership with INKA is expected to improve production capacity, rolling stock quality, human resource competencies, and after-sales services within the domestic industry.

Under the rolling stock replacement program for 2023–2027, KAI ordered 612 Stainless Steel New Generation passenger cars from INKA, worth Rp5.5 trillion. Of the 56 trainsets ordered, 40 have been handed over to KAI, with 39 already in operation and one undergoing operational preparations.

Investment Extends to Commuter Lines and the Jabodebek LRT

For urban rail services, KAI Group has allocated Rp4.07 trillion for new Commuter Line trains and the retrofitting, or refurbishment, of existing trainsets.

The new procurement covers 16 trainsets, comprising 192 cars, at a cost of nearly Rp3.83 trillion. Meanwhile, the retrofit program covers two trainsets valued at more than Rp238.63 billion. Of the 16 new trainsets, seven, comprising 84 cars, are already in operation, while the remaining nine are undergoing production, testing, certification, and operational preparations.

INKA is also manufacturing 31 Jabodebek LRT trainsets comprising 186 cars, under a contract valued at approximately Rp3.9 trillion to Rp4.1 trillion. The service uses Grade of Automation 3 (GoA3) technology.

In the first half of 2026, the Jabodebek LRT served 16,018,911 passengers, an increase of 22.84% compared with the same period a year earlier.

Luxury Trains and Freight Wagons

In the premium segment, KAI is procuring 10 luxury train cars, each with a capacity of 26 seats. One additional car is being prepared as a reserve to support fleet maintenance. The procurement contract is worth Rp161.16 billion.

For logistics transportation, KAI and INKA are procuring 1,125 BM 54-ton flat wagons valued at Rp1.05 trillion. The wagons are intended to increase freight capacity in South Sumatra, particularly for coal, which is one of the country’s key energy supply sources.

List of New Generation Train Routes

The rolling stock modernization program also includes modified New Generation economy trains and newly built Stainless Steel New Generation trainsets. Below are several services operated using these trainsets, based on the published list:

Train service Route
Blambangan Ekspres Pasar Senen–Ketapang (round trip)
Dharmawangsa Ekspres Pasar Senen–Surabaya Pasarturi (round trip)
Mutiara Timur Surabaya Pasarturi–Ketapang (round trip)
Brantas Pasar Senen–Blitar (round trip)
Ranggajati Cirebon–Jember (round trip)
Banyubiru Ekspres Semarang Tawang–Solo Balapan (round trip)
Kamandaka Semarang Tawang–Tegal–Purwokerto (round trip)
Ijen Ekspres Malang–Ketapang (round trip)
Pasundan Kiaracondong–Surabaya Gubeng (round trip)
Matarmaja Pasar Senen–Malang (round trip)
Lodaya Bandung–Solo Balapan (round trip)
Gaya Baru Malam Selatan Pasar Senen–Surabaya Gubeng (round trip)
Mataram Pasar Senen–Solo Balapan (round trip)
Jayabaya Pasar Senen–Malang (round trip)
Bogowonto Pasar Senen–Lempuyangan (round trip)
Progo Pasar Senen–Lempuyangan (round trip)
Majapahit Pasar Senen–Malang (round trip)
Singasari Blitar–Pasar Senen (round trip)

The published list also includes the Jonglosemarkerto, Sancaka Utara, Tegal Bahari, Batavia, Gumarang, Fajar Utama Solo, Senja Utama Solo, Jaka Tingkir, Cirebon Fakultatif, and Bangunkarta services.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button